A1
The overall aim from National Highways is to close all 59 central reservation gaps along the A1 between Blyth and Stamford. This includes everything from the junctions down to smaller pedestrian only access gaps. The idea is to bring up the overall safety of the A1 and closing the gaps forms a large proportion of the work required to bring up the standard.
please click the line below to view the press release of the event
https://www.lincolnshire.gov.uk/news/article/2284/a1-safety-event-a-real-success-story